The responsibility for developing the area, as well as building and operating the metro, was given to the Ørestad Development Corporation, a joint venture between Copenhagen Municipality (45%) and the Ministry of Finance(55%). M2 continues in tunnel until after Lergravsparken, where it starts to follow the former Amager Line. Et de 4 ! The stations are built with island platforms[70] and are fully accessible for people with disabilities. The City Circle Line (Danish: Cityringen) or M3 is a loop line of the Copenhagen Metro.It has been claimed by COWI A/S that the City Circle Line is the largest construction project to have taken place in Copenhagen during the last 400 years. Our design thinking always takes this city-wide perspective, looking for ways to maximise the wider socio-economic benefits new systems might bring. In each car, the two motors are fed by the car's own IGBT motor drive. Le métro de Copenhague utilise la carte de paiement électronique appelée Rejsekort. The Copenhagen Metro constructs and operates the Metro in Copenhagen. Our consortium was awarded the design-build contract for the Copenhagen metro’s fourth line. The metro trains were originally planned to be four cars long, but trains were reduced to three cars per set as a savings measure. [31] During 2008, the metro experienced a 16% passenger growth to 44 million passengers per year. The metro solution was chosen because it combined the highest average speeds, the highest passenger capacity, the lowest visual and noise impact, and the lowest number of accidents. The metro has 39 stations, 25 of which are underground. The Circle Line is served on the whole loop as M3 and additionally on its eastern (lower) part between Orientkaj and København H as M4. [55] Work on the study is expected to continue until 2020. This caused four days without a bus service along the line. The Copenhagen Metro already operates two automated metro lines and will add the first stage of a fourth line early 2020. This project was abandoned, as the interchange chamber between any such line and the City Circle Line was scrapped as part of the City of Copenhagen's 2009 budget. The system would have the same frequency as the tram, but use double trams and would therefore require larger stations. Single tickets and City Passes can be purchased from all the metro stations. The Danish Transport Authority (Trafikstyrelsen) has suggested converting the F-line of the S-train network to metro standard as an M5 line. Sydhavn Metro Line is a 4.4km-long underground line under construction in the Sydhavn area in Copenhagen, Denmark. The M3 is a circle line connecting Copenhagen Central Station with Vesterbro, Frederiksberg, Nørrebro, Østerbro and Indre By districts. On 28 November, laying of tracks along stage 1, and stage 2A from Nørreport to Frederiksberg, was completed. This forced construction to stop work at 6PM until a final ruling was made, thus delaying the completion date. Externally, anodised aluminium cladding is used on all facades as well as roof and soffit, to ensure the station looks appealing from all angles, anticipating the future high-rise developments around the station. There are emergency exits every 600 m (660 yd), so that no train is ever further than 300 m (330 yd) from an exit. Initially, three modes were considered: a tramway, a light rail and a rapid transit. How to apply How we construct the metro. Plus if you are going further than downtown, than the Metro in Denmark may be the wrong choice. [52], In September 2011, the city of Copenhagen and neighbouring Malmö in Sweden announced that they were seeking European Union funding to study a potential metro line under the Øresund to the neighbourhood of Malmö Central Station, providing faster trips and additional capacity beyond that of the existing Øresund Bridge. Travel information. The Nordhavn extension of Copenhagen’s M4 metro is a dual track line branching off from the Cityringen metro, which opened in 2019. .mw-parser-output .RMbox{box-shadow:0 2px 2px 0 rgba(0,0,0,.14),0 1px 5px 0 rgba(0,0,0,.12),0 3px 1px -2px rgba(0,0,0,.2)}.mw-parser-output .RMinline{float:none;width:100%;margin:0;border:none}.mw-parser-output table.routemap{padding:0;border:0;border-collapse:collapse;background:transparent;white-space:nowrap;line-height:1.2;margin:auto}.mw-parser-output table.routemap .RMcollapse{margin:0;border-collapse:collapse;vertical-align:middle}.mw-parser-output table.routemap .RMreplace{margin:0;border-collapse:collapse;vertical-align:middle;position:absolute;bottom:0}.mw-parser-output table.routemap .RMsi{display:inline;font-size:90%}.mw-parser-output table.routemap .RMl1{padding:0 3px;text-align:left}.mw-parser-output table.routemap .RMr1{padding:0 3px;text-align:right}.mw-parser-output table.routemap .RMl{text-align:right}.mw-parser-output table.routemap .RMr{text-align:left}.mw-parser-output table.routemap .RMl4{padding:0 3px 0 0;text-align:left}.mw-parser-output table.routemap .RMr4{padding:0 0 0 3px;text-align:right}.mw-parser-output table.routemap>tbody>tr{line-height:1}.mw-parser-output table.routemap>tbody>tr>td,.mw-parser-output table.RMcollapse>tbody>tr>td,.mw-parser-output table.RMreplace>tbody>tr>td{padding:0;width:auto;vertical-align:middle;text-align:center}.mw-parser-output .RMir>div{display:inline-block;vertical-align:middle;padding:0;height:20px;min-height:20px}.mw-parser-output .RMir img{height:initial!important;max-width:initial!important}.mw-parser-output .RMir .RMov{position:relative}.mw-parser-output .RMir .RMov .RMic,.mw-parser-output .RMir .RMov .RMtx{position:absolute;left:0;top:0;padding:0}.mw-parser-output .RMir .RMtx{line-height:20px;height:20px;min-height:20px;vertical-align:middle;text-align:center}.mw-parser-output .RMir .RMsp{height:20px;min-height:20px}.mw-parser-output .RMir .RMtx>abbr,.mw-parser-output .RMir .RMtx>div{line-height:.975;display:inline-block;vertical-align:middle}.mw-parser-output .RMir .RMts{font-size:90%;transform:scaleX(.89)}.mw-parser-output .RMir .RMf_{height:5px;min-height:5px;width:20px;min-width:20px}.mw-parser-output .RMir .RMfm{height:100%;min-height:100%;width:4px;min-width:4px;margin:0 auto}.mw-parser-output .RMir .RMo{width:2.5px;min-width:2.5px}.mw-parser-output .RMir .RMc{width:5px;min-width:5px}.mw-parser-output .RMir .RMoc{width:7.5px;min-width:7.5px}.mw-parser-output .RMir .RMd{width:10px;min-width:10px}.mw-parser-output .RMir .RMod{width:12.5px;min-width:12.5px}.mw-parser-output .RMir .RMcd{width:15px;min-width:15px}.mw-parser-output .RMir .RMocd{width:17.5px;min-width:17.5px}.mw-parser-output .RMir .RM_{width:20px;min-width:20px}.mw-parser-output .RMir .RM_o{width:22.5px;min-width:22.5px}.mw-parser-output .RMir .RM_c{width:25px;min-width:25px}.mw-parser-output .RMir .RM_oc{width:27.5px;min-width:27.5px}.mw-parser-output .RMir .RM_d{width:30px;min-width:30px}.mw-parser-output .RMir .RM_od{width:32.5px;min-width:32.5px}.mw-parser-output .RMir .RM_cd{width:35px;min-width:35px}.mw-parser-output .RMir .RM_ocd{width:37.5px;min-width:37.5px}.mw-parser-output .RMir .RMb{width:40px;min-width:40px}.mw-parser-output .RMir .RMcb{width:45px;min-width:45px}.mw-parser-output .RMir .RMdb{width:50px;min-width:50px}.mw-parser-output .RMir .RMcdb{width:55px;min-width:55px}.mw-parser-output .RMir .RM_b{width:60px;min-width:60px}.mw-parser-output .RMir .RM_cb{width:65px;min-width:65px}.mw-parser-output .RMir .RM_db{width:70px;min-width:70px}.mw-parser-output .RMir .RM_cdb{width:75px;min-width:75px}.mw-parser-output .RMir .RMs{width:80px;min-width:80px}.mw-parser-output .RMir .RMds{width:90px;min-width:90px}.mw-parser-output .RMir .RM_s{width:100px;min-width:100px}.mw-parser-output .RMir .RM_ds{width:110px;min-width:110px}.mw-parser-output .RMir .RMbs{width:120px;min-width:120px}.mw-parser-output .RMir .RMdbs{width:130px;min-width:130px}.mw-parser-output .RMir .RM_bs{width:140px;min-width:140px}.mw-parser-output .RMir .RM_dbs{width:150px;min-width:150px}.mw-parser-output .RMir .RMw{width:160px;min-width:160px}.mw-parser-output .RMir .RM_w{width:180px;min-width:180px}.mw-parser-output .RMir .RMbw{width:200px;min-width:200px}.mw-parser-output .RMir .RM_bw{width:220px;min-width:220px}.mw-parser-output .RMir .RMsw{width:240px;min-width:240px}.mw-parser-output .RMir .RM_sw{width:260px;min-width:260px}.mw-parser-output .RMir .RMbsw{width:280px;min-width:280px}.mw-parser-output .RMir .RM_bsw{width:300px;min-width:300px}. The system is integrated with other public transport in Copenhagen. The articulated trams would have been about 35 m (115 ft) long and have a capacity for 230 passengers. In 2003 and 2007, the Metro was extended to Vanløse and Copenhagen Airport (Lufthavnen) respectively, adding an additional six plus five stations to the network. [14], In March 2001, Copenhagen County Council decided to start construction of stage 3. These new stations are just part of the wider Nordhavn Masterplan, which will redevelop Copenhagen’s docklands, adding over 1,500,000m, Commissioning and building performance evaluation, Technology operations and project management. History. How to apply How we construct the metro. Status på metrobyggeriet Følg fremdriften på M4 til Sydhavn samt Metroens øvrige byggeri og vedligeholdelse. [46] Instead, the city preferred the M4 to branch at Østerport station to facilitate development of the Nordhavn harbour area. Drawing on the expertise of 100 rail specialists, from inside and outside Arup, this timely report brings together the insights, debates and discussions that are shaping today’s rail agenda. Bioaccez a participé au projet en installant un système de contrôle d'accès pour localiser les personnes dans les tunnels pendant les phases d'électrification. How to apply How we construct the metro. M4 Nordhavn. [63] The system lies within four different zones. Access to the track is blocked by platform screen doors. Tickets and zones. Facts. With the opening of the Metro's new M3 Cityring line, people in Copenhagen have a new way of getting around. To the southeast, the system serves Amager, with the 13.9-kilometre (8.6 mi)[3] M1 running through the new neighborhood of Ørestad, and the 14.2-kilometre (8.8 mi)[3] M2 serving the eastern neighborhoods and Copenhagen Airport. The price was estimated at 11.5 to 18.3 billion Danish krone (DKK), of which DKK 5.4 billion will be financed though ticket sales, and the remaining from the state and municipalities. There are four large 'flex areas' in each train with folding seats providing space for wheelchairs, strollers and bicycles. The circle has 17 stations, two of which are interchanges with both the M1 and M2 lines, as well with three Copenhagen S-train stations. The metro extension to Sydhavn was approved by the Danish Parliament in … Other aspects of the system, such as power supply, ventilation, security alarms, cameras and pumps, are controlled by a system called "control, regulating and surveillance". [23] The Ørestad Development Corporation was discontinued in 2007, and the ownership of the metro was transferred to Metroselskabet I/S. [63] As of 2012, the metro has fully adapted to the national electronic fare card system Rejsekort. The safety and signaling specifications are based on the German BOStrab, and controlled by TÜV Rheinland and Det Norske Veritas under supervision of the Public Transport Authority. [74], The Control and Maintenance Center is a 1.1-hectare (2.7-acre) facility located at the south end of M1. [42], The northern extension, Nordhavn station and Orientkaj station,[43] are both begun service on 28 March 2020. Facts . [2], The trains are 39 m (128 ft) long, 2.65 m (8 ft 8 in) wide, and weigh 52 tonnes (51 long tons; 57 short tons). There are transfers to Movia bus services at all but four stations. [72], The entire metro system and the trains are run by a fully automated computer system, located at the two Control and Maintenance Centers, south of Vestamager Station (M1 + M2), and at Sydhavnen (M3 + M4). Nytorv, Frederiksberg and Flintholm, but mediocre at best at at Østerport, Kbh. The jury noted the system's high regularity, safety and passenger satisfaction, as well as the efficient transport to the airport. [72], Each car is equipped with two three-phase asynchronous 105-kilowatt (141 hp) motors, giving each train a power output of 630 kilowatts (840 hp). Painless transfer in and around Copenhagen Metro? ... (blau) und M4 (orange). The M3 has transfers to M1 and M2 at Frederiksberg and Kongens Nytorv. After opening of the City Circle Line, the metro system is featured 3 lines with a total of 37 stations. [76], Construction of lines M3, City Circle line and M4, the Harbour Line. Plans for M2 were presented to the public in April 1999, with a debate emerging if the proposed elevated solution was the best. [61] Of the initial 22 stations on lines M1 and M2, nine are underground and six of these are deep-level. Changes in operations Changes night M3 Cityringen. M2 is a line of the Copenhagen Metro, colored yellow on the map.It runs from Vanløse to Lufthavnen through the center of Copenhagen, sharing track with the M1 from Vanløse to Christianshavn.The line was built along with M1 as part of the redevelopment of Ørestad.The principle of the line was passed in 1992, and construction commenced in 1998. The Copenhagen Metro is a modern driverless light rail system that has two lines, both of which offer service to 22 stations. As part of a separate joint venture team, Arup has a continuing major role for the next phase of the M4 metro project, which will see it extend in the south of the capital to the district of Sydhavn, helping increase mobility and reduce congestion. The M4 was opened on 28 March 2020 when two additional stations were opened in the Nordhavn district. da en. Both M3 and M4 will run from København H (Main Train Station) over Rådhuspladsen and Christiansborg to the existing metro station at Kongens Nytorv, where they will cross M1 and M2. Our design thinking always takes this city-wide perspective, looking for ways to maximise the wider socio-economic benefits new systems might bring. In 2019, the metro carried 79 million passengers. The addition of this line will relocate the M4's southern terminus from Copenhagen Central Station to Ny Ellebjerg. Menu. [22] In 2006, it was announced that the contract with Ansaldo to operate the metro had been prolonged another three years. [61], The system is owned by Metroselskabet, who is also responsible for building the City Circle Line. The ATP is responsible for keeping the trains' speed, ensuring that doors are closed before departure and switches are correctly set. Transfer from the Copenhagen Metro to regional trains is possible at Copenhagen Central Station, Lufthavnen, Nørreport, Ørestad and Østerport stations. in 2010, and construction of work sites and stations began in 2011. Planned route of new metro lines in Copenhagen. However, the line caused a heated debate, with several locals organized themselves into the Amager Metro Group. The M3 line is the City Ring line and the M4 is the line that runs between Nordhavn Station and Copenhagen Central. READ ALSO: Storm floods could put the Metro out of service for a long time. Scheduled to be opened in 2024, the extension aims to meet the transport needs of the city’s growing population. The light in the stations is automatically regulated to make best use of the daylight and maintain a constant level of illumination of the stations at all times. It is an extension of Copenhagen Metro’s Line 4 (M4). The Copenhagen Metro already operates two automated metro lines and will add the first stage of a fourth line early 2020. This new branch will unlock the potential for the Nordhavn masterplan by developing a transport hub for a docklands redevelopment in the city. [5] Platforms are – although shorter than originally planned – built to accommodate trains with four cars, and the automatic doors can be modified accordingly should the need arise.[5]. The two sculptural staircases are submerged in light, guiding passengers safely up to the platform level. [53] The study, for which the EU granted funding in the following December,[54] will consider both a simple shuttle between the two stations and a continuous line integrated with the local transport networks on each side, and they anticipate a travel time of 15 minutes between the two city centers. Par contre, ce service n’est disponible que pour les résidents. At this time, the metro system will cover 39.5 km, have 39 stations and is expected to carry more than 120 million passengers each year. [70], The system uses 64 driverless electric multiple units built by AnsaldoBreda and designed by Giugiaro Design of Italy called the AnsaldoBreda Driverless Metro. Los billetes se pueden comprar en las paradas de metro y de tren de Copenhague. Kundeservice og rejseregler . Rejser. Het depot met onderhoudswerkplaats van de lijnen M3 en M4 ligt naast de werkplaats van de ... De bouw van de cityring werd na een aanbestedingsprocedure gegund aan het consortium Copenhagen Metro Team I/S van drie Italiaanse bedrijven Salini Costruttori, Maire Tecnimont en Società Esecuzione Lavori Idraulici (SELI), dat op zijn beurt verschillende onderaannemers inhuurde. A further extension of M4 with 5 additional stations has already started. Any branch to the Herlev / Brønshøj region would now require a shutdown of the City Circle Line for an extended period of time. M1 og M2 M3 Cityringen M4 Status på Coronavirus/Covid-19. Obras del metro. [56], The metro consists of four lines, M1, M2, M3 and M4. M4 kører fra København H mod Østerport og fortsætter herfra til de to nye metrostationer Nordhavn og endestati onen Orientkaj. Menu. Archaeological and geological surveys started in 2007, preferred bidders were announced in November 2010[37] and contracts were signed in 2011. Metro of Copenhagen Europe / Denmark. [70], The elevated stations are built in glass, concrete and steel to minimize their visual impact. Fremtiden har været førerløs siden 2002, hvor Københavns metro for første gang kunne sende passagerer afsted i de underjordiske tunneler i et tog uden fører. Psst… Klik på stationerne og få vist info og afgange Du kan også finde din rejse på rejseplanen Gå til rejseplanen Metroen har fire linjer og en forlængelse på vej. In May, the first trains were delivered, and trial runs began at the depot. Kruse Way Lake Oswego office space available now - zip 97035, Lake Oswego office space for lease or rent. La plus rapide est en taxi, ce qui prendrait 8 mins. Travel time of the Cityringen M3 is 24 minutes. Cool Construction. The group argued that the line should have been built underground, citing concerns that it would create noise pollution and a physical barrier in Amager. [16], Construction started in November 1996, with the moving of underground pipes and wires around the station areas. The Nordhavn extension of Copenhagen’s M4 metro is a dual track line branching off from the Cityringen metro, which opened in 2019. Find out how it will change commuting for locals and tourists in Denmark's capital. The new above ground station at Orientkaj celebrates the large-scale, brutalist features of industrial design and port/harbour structures: bold concrete claws bolt the station onto twin concrete viaducts housing the tracks, supported on 33-metre span, v-shaped concrete piers that minimise footprint and maximise the open, flexible urban space underneath. The cost is the same and it stops at the main train station, yet with the metro you will have to switch lines. [65] Outside the Central zones, the outer zones are divided into sub-zones and ticketing can be a bit confusing for visitors familiar with how zones work in London or Berlin. Between Ny Ellebjerg station and Orientkaj in the Nordhavn area, except for a few more stations northeast of Orientkaj. After Christianshavn, the line splits in two. Currently 3 test trains are in circulation evaluating the change. Luk. It is expected to be accessed by approximately 240,000 passengers a day. [34] In May 2009, six companies were pre-qualified to bid for the public service obligation to operate the metro. Both companies will combine their skills in design, project management and underground works to build the new metro line. [69] Stations have an information column in front, marked with a large 'M' and featuring information screens. Metro til Lynetteholm ... M4 har 8 stationer og kører fra København H til Orientkaj i Nordhavn . [61] During rush hour (07:00–10:00 and 15:00–18:00), on the M3 (Cityringen) there is a three-minute headway. On 28 March 2020, the first part of the M4 line opened, adding two additional stations and an increased number of trains on the København H - Østerport part of the City Circle Line. With the opening of the Metro's new M3 Cityring line, people in Copenhagen have a new way of getting around. Podéis pagar con coronas danesas y con tarjeta de crédito. Hvis du skal videre rundt i M3 Cityringen, skal du derfor skifte til et M3-tog. Billetter og Zoner. April 2020, with 2 new stops to Nordhavn and 6 stations shared with Cityringen M3 line. In 2019, seventeen stations on a wholly underground circle line, the M3, was added bringing the number of stations to 37.[4]. [38] Preparations began by moving utilities etc. 2
In July 2013, Natur- og Miljøklagenævnet, the environmental appeals board, ruled that the city was wrong to grant Metroselskabet permission for 24-hour work days and noise levels of up to 78 db at the Marmorkirken site. En toute discrétion compte-tenu des évènements, La partie nord de la nouvelle ligne [17] Operation of the system was subcontracted to Ansaldo, who again subcontracted it to Metro Service, a subsidiary of Serco. In October and November, the two tunnel boring machines (TBM), christened Liva and Betty, were delivered. Changes in operations Changes night M3 Cityringen. The article continues below. The trains on the line will travel at an average speed of 40km/h. [63] A two-zone ticket costs DKK 24, and a three-zone ticket DKK 36, and tickets are good for 60 minutes. The last section of tunnel was completed in February 2001. The ... With as little as two minutes between the driverless trains and a high reliability, the metro in Copenhagen has been voted the best in the world several times. I hovedstaden bygger vi hele tiden mere metro, og i øjeblikket er vi i gang med at udvide metronettet med fem nye stationer i Sydhavn og to nye stationer i Nordhavn. The new branch connects the existing Cityringen M3 line to the M4 line’s new Nordhavn metro station via a 1.9km long twin-bore tunnel which then rises through a cut and cover tunnel and embankment, to an elevated viaduct and overground station at Orientkaj. [24], In January 2007, the city council decided that a branch was to be built during construction at Nørrebro, to allow a future branch line from the City Circle Line towards Brønshøj. The depot also has several maintenance trains, including diesel locomotives[75] that are able to retrieve broken down or disabled trains. Læs om M4. The platforms are located 18 m (59 ft) below the surface. [60] Travel time from Nørreport to Vestamager on M1 is 14 minutes, to the airport on M2 is 15 minutes, and to Vanløse on M1 and M2 is 9 minutes. [25] The Herlev/Brønshøj line was ultimately dropped as the City of Copenhagen withdrew its share of the cost of the Nørrebro branch chamber in its 2009 budget, and the state refused to continue the project.